Events and Courses Listing

IES Virtual Classroom -Supervision of Underground Projects with Deep Excavation & Bored Tunneling 1st Run


Date(s):
7th - 8th Jul 2021
Time:
2:00PM - 5:15PM -
Venue:

Costs:

Member: $196.90
Non Member: $231.10

Members, login now to receive your best price
CPD:
STU (Safety) 4
PDU (PEB) 6
PDU (CEng) 6
Description:

 Supervision of Underground Projects with Deep Excavation & Bored Tunneling 1st Run

Part 1: Supervision of ERSS and GBW Works for Deep Excavation Projects (2 Hours)

This session will give an introduction to the various types of temporary work for deep excavation projects.  These temporary works are either classified as Earth Retaining & Stabilising System (ERSS) or Geotechnical Building Work (GBW) by BCA depending on the excavation depth and retained height.  It is important to first understand the key factors affecting the design safety of the various types of ERSS and GBW, in order to be able to carry out the necessary supervision of these ERSS and GBW.  Therefore participants will be able to learn the important features of these types of ERSS and GBW design concept and construction sequence in this session.  The participants will also learn about the process of deep excavation management including managing the instrumentation & monitoring, and managing the groundwater control and ground settlement.  This 2 hour session will prepare the participants to be able to have good understanding of the deep excavation project and thus

Course Outline

• Introduction to the various types of temporary work for deep excavation projects
• Understanding of temporary works classification as Earth Retaining & Stabilising System (ERSS) or Geotechnical Building Work (GBW) by BCA
• Learning the important features of these types of ERSS and GBW design concept and construction sequence
• Learning about the process of deep excavation management including managing the instrumentation & monitoring
• Learning about the process of deep excavation management including managing g the groundwater control and ground settlement
• Understanding of the supervision procedures for deep excavation works

 

Part 2:  BCA Regulatory Framework for Supervision of Deep Excavation Projects Illustrated with Case Histories (1 Hour)

There are many current underground projects in Singapore such as Mass Rapid Transit (MRT) Thomson East Coast Line (TEL), North South Corridor (NSC) highway, Deep Tunnel Sewerage System (DTSS), Singapore Power Underground Substation (UGSS), underground drainage, sewerage and water pipelines projects. Hence it is very important to have a comprehensive and clear regulatory framework to ensure deep excavation underground projects are carried out in a safe manner and the supervision of deep excavation underground projects are well managed.  This session will illustrate the BCA regulatory framework in Singapore for design submission approval and construction supervision and management of deep excavation projects.  This session will use some case histories to illustrate some of the more commonly encountered regulations to be complied with and it will also highlight some of the latest guidelines for supervision of deep excavation projects..

 Course Outline

• Introduction of current underground projects in Singapore such as Mass Rapid Transit (MRT) Thomson East Coast Line (TEL), North South Corridor (NSC) highway, Deep Tunnel Sewerage System (DTSS), Singapore Power Underground Substation (UGSS), underground drainage, sewerage and water pipelines projects
• Understanding of the comprehensive and clear regulatory framework to ensure deep excavation underground projects are carried out in a safe manner
• Understanding of the supervision procedures of deep excavation underground projects
• Illustration of the BCA regulatory framework in Singapore for design submission approval and construction supervision and management
• Discussion of some case histories to illustrate some of the more commonly encountered regulations to be complied for deep excavation projects.
• Discussion of some case histories to highlight some of the latest guidelines

 

Part 3:  Basic Principles and Key Performance Indicators for Supervision of Bored Tunneling & Pipe Jacking Works (2 Hours)

In this session, the participants will learn about the basic principles of segmental lining bored tunneling with Earth Pressure Balance Machine (EPBM) and Slurry Shield tunnel boring machine(Slurry TBM), as well as pipe jacking micro tunnel boring machine.  With this understanding, the participants will next learn about the various Key Performance Indicator (KPI) for the safe bore tunneling process using bored tunnel machine (TBM).  KPI for bored tunneling is important to ensure that the tunneling is safe and does not have adverse impact to the adjacent ground and buildings.  The participants will learn about the sequence of work for bored tunneling from construction of TBM shaft, erection of reaction frame, temporary rings, initial drive and main drive. This will equip the participant the necessary basic knowledge in supervision of bore tunneling works.

Course Outline

• Learning about the basic principles of segmental lining bored tunneling with Earth Pressure Balance Machine (EPBM) and Slurry Shield tunnel boring machine(Slurry TBM), as well     as pipe jacking micro tunnel boring machine
• Learning about the various Key Performance Indicator (KPI) for the safe bore tunneling process using bored tunnel machine (TBM)
• Understanding of the importance of KPI for bored tunneling to ensure that the tunnelling is safe and does not have adverse impact to the adjacent ground and building

• Learning about the sequence of work for bored tunneling from construction of TBM shaft, erection of reaction frame, temporary rings, initial drive and main drive
• Learning the other necessary basic knowledge in supervision of bore tunneling works;
• Understanding of the supervision procedures for bored tunnelling works

 

Part 4:  BCA Regulatory Framework for Supervision of Tunneling Projects Illustrated with Case Histories (1 Hour)

It is very important to have a comprehensive and clear regulatory framework to ensure bored tunnelling underground projects are carried out in a safe manner and the supervision of these tunnelling underground projects are well managed.  This session will illustrate the BCA regulatory framework in Singapore for design submission approval and construction supervision and management for bored tunnelling works.  This session will use some case histories to illustrate some of the more commonly encountered regulations to be complied with and it will also highlight some of the latest guidelines for supervision of bored tunnelling works..

 Course Outline

• Introduction of current underground projects in Singapore such as Mass Rapid Transit (MRT) Thomson East Coast Line (TEL), North South Corridor (NSC) highway, Deep Tunnel       Sewerage System (DTSS), Singapore Power Underground Substation (UGSS), underground drainage, sewerage and water pipelines projects
• Understanding of the comprehensive and clear regulatory framework to ensure these underground projects are carried out in a safe manner
• Understanding of the supervision procedures of underground projects with bored tunnelling
• Illustration of the BCA regulatory framework in Singapore for design submission approval and construction supervision and management for bored tunnelling works
• Discussion of some case histories to illustrate some of the more commonly encountered regulations to be complied for bored tunnelling works
• Discussion of some case histories to highlight some of the latest guidelines for bored tunnelling works

 

Prior to attending this course, you should:

·         Have a PC / laptop / tablet / smart phone with built-in or external webcam.

·         Installed the zoom client.

·         Have Wi-Fi / high speed internet connection available.

·         Receive an email with a link for you to submit a registration for webinar 1 week prior to the commencement.

·         Receive an email with a link and password for you to join the webinar session after your registration is successful.

Please click HERE for more course information & manual registration form. 

SUPPORTED BY:

Union Training Assistance Programme (UTAP) - Pending for Approval

This course is NOT SkillsFuture Credit Funded

** Must read Information for SFC/UTAP claim, please click HERE**


CPD:

6 STU (Structural)- To Be Confirmed

6 PDU - To Be Confirmed

COORDINATOR: Karen Phua
COORDINATOR CONTACT NO.: (DID) 6461 1239, (MAIN LINE) 6463 9211
EMAIL:

karen@iesnet.org.sg 

REMARKS:

Course Fees is inclusive of GST.

E-Certificate of Attendance will be given to participants with 100% attendance and full course fee payment made.

For all individual paying participants (not sponsored by company), Must make payment 1 week before course date.


If payment is via cheque, the cheque should be made payable to IES ACADEMY PTE LTD and mail to 80 Jurong East Street 21, #04-10, Devan Nair Institute For Employment and Employability, Singapore 609607


Yet to be allocated
Ref: IESA-P0000001-649
 
 

A post shared by The Inst. of Engineers, SG (@engineerssg) on